Wacker Neuson - Home
Climate Technology
 
Home
Home Products How it Works Jobsite Solutions Tradeshows News Contact Us  
Spacer
 
Dealer Locator
Hydronic Heat
Air Heat
Drying
Cost Estimator
 
 

How it Works: Curing

Curing

  • Cure concrete - achieve required strength gain sooner
  • Quote projects accurately
  • Keep projects on schedule
  • Keep crews and equipment working all winter
  • Avoid risk and expense of frozen concrete
  • No expensive enclosures to build
Curing Concepts Sheet

Click here to view Curing Concepts Sheet   Pdf 266KB

Click here to view Red Wave Blanket literature Pdf 82KB


Curing: Laying Blankets on Bridge
Click here or on the image above for larger view

Curing Videos
Interested in seeing more? Click on the play button or the video title to view a brief, streaming video. Or click on a file size to download.

Concrete Curing with Pex Tubing in Sub-Freezing Temperatures
  Concrete Curing with Pex Tubing in Sub-Freezing Temperatures

For Download:
    - 9.7 MB: Concrete Curing with Pex Tubing in Sub-Freezing Temperatures- dialup
    - 19.5 MB: Concrete Curing with Pex Tubing in Sub-Freezing Temperatures- broadband
Curing Slabs on a Grade
  Curing Slabs on a Grade

For Download:
    - 4 MB: Curing Slabs on a Grade - dialup
    - 8.5 MB: Curing Slabs on a Grade - broadband
Curing Elevated Slabs & Bridge Decks
  Curing Elevated Slabs & Bridge Decks

For Download:
    - 15.9 MB: Curing Elevated Slabs & Bridge Decks - dialup
    - 34.2 MB: Curing Elevated Slabs & Bridge Decks - broadband
Curing Poured & Tilt Up Walls
  Curing Poured & Tilt Up Walls

For Download:
    - 3.2 MB: Curing Poured & Tilt Up Walls - dialup
    - 6.9 MB: Curing Poured & Tilt Up Walls - broadband


 
 

Outside the Americas

Subfreezing temperatures create a number of unique challenges throughout the world. Wacker Neuson Climate Technology is your global solution to quickly and efficiently thaw frozen ground, cure concrete and provide clean dry heat to structures.

E 700M Delivers the Heat for Bickhardt Bau Bridge Restoration Projects
-
Siegen, Germany
E 700M Delivers the Heat for Bickhardt Bau Bridge Restoration Projects

A two-part synthetic resin used to protect concrete on bridges from corrosion requires a minimum structure temperature of 41° F to properly work. When subfreezing winter temperatures stopped work on a bridge restoration project, Bickhardt Bau used the E 700M to quickly heat the structure above minimum temperatures, keeping the job on schedule.
Click to read more…
Pureheat Delivers Significant Advantages in Underground Tank Application
-
Dromore, Ireland Pureheat Delivers Significant Advantages in Underground Tank Application
Rather than running ductwork to use the old standby of indirect-fired heaters for heating a 1.78 million ft3 underground potable water tank, John Grahams chose the clean, dry heat offered by the Wacker Neuson Pureheat system. In doing so, Grahams realized a fuel savings of over $1,000 per 72 hours of use. 
Click to read more…
Wacker Neuson Heating Equipment Makes a Splash at Danube Swimmers’ Ball
-
Neuburg an der Donau, Germany
Wacker Neuson Heating Equipment Makes a Splash at Danube Swimmers’ Ball
A creative solution found the HP 252 and E 700M hydronic heaters teaming up to comfortably heat a 187,167 ft3 tent and 2,690 ft2 dance floor at the Danube Swimmers’ Ball. As outside temperatures dropped to 14° F outside, the environment inside the tent was comfortably maintained in the mid-70° F range.
Click to read more…
Contact

Wacker Neuson
N92 W1500 Anthony Avenue
Menomonee Falls, WI 53052-9007
Tel: 262.255.0500
www.wackerneuson.com
Email Us

 

 

Top
     
Dealer Locator | Hydronic Heat | Air Heat | Drying | Cost Estimator | Contact Us
Home | Site Map | Imprint - Site Policies

© Wacker Neuson